A review of the manufacturing processes and Inspection Points Plans is the beginning of our comprehensive service which ends with certifying that the installed equipment meets legal requirements.

MANUFACTURING REVIEW PROCEDURES

At SCI we have qualified personnel  for the review of the manufacturing processes: our personnel are able to fully understand  all the relevant documentation generated by a manufacturer and so verify that the quality of the equipment being manufactured meets the compliance requirements of each project.

MANUFACTURING PROCEDURES  involves the following main areas of testing:

PROCEDURES FOR NON DESTRUCTIVE TESTING

  • Magnetic particles.
  • Dye penetrants.
  • Radiographs.
  • Ultrasounds (manual, Phased Array and TOFD).
  • Traceability verification marks.

OTHER TESTING PROCEDURES

  • Hydraulic tests.
  • Pneumatic tests.
  • Leak tests with helium as well as air
  • Funcionality test.
  • Test of performance.
  • Painting process.

REVIEW OF INSPECTION POINTS PLANS

Another of our services we provide is a content analysis of the Inspection Points Plan issued by the manufacturer.

Inspection Points Plans (PPI) are used to monitor and verify that the inspection requirements, test code design and various other project requirements are complied with.

The purpose of issuing an Inspection Points Plan is  to verify that the checkpoints of these  plans meet design code requirements, applicable project  and customer and/ or licensor specifications.

For more information related to this service

Contact SCI in our phone (+001 713 943 12 20) or through our e-mail sci@sciusacorp.com. You can visit us at our offices in USA, Spain, France, ChinaMexico, Peru or Chile.